- 1 new camera installation
2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating




2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating




IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
SCADA Room & Work Station CPU cleaning
Problem found: POE Switch & 4 NOS CC camera problem found.
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…