DTW-102 Scada Pack Programing And Install Done




DTW-102 Scada Pack Programing And Install Done




1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist