The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight
for future checking need a new antenna





The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight
for future checking need a new antenna





IRP-1 Sand Filter FCP Panel Cleaning Done
Breaker installation for SCADA control Room Monitor Done
Fiber Optical Maintenance Near DTW-103
Dtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning
VFD modbus interrupt problem found. Than reset the VFD.