ACTIVITY | DAILY REPORTS | Parvez | REPORTS OGR Booster room dewatering pump run command showing problem at low level Posted onDecember 6, 2022December 6, 2022 Float switch reconnection and rearrange. Now normal
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS SCADA Room & Work Station CPU cleaning Posted onDecember 21, 2022December 21, 2022 SCADA Room & Work Station CPU cleaning
ACTIVITY PWID51:DTW210 to 222 TJ Box sealing with silicon glue. Posted onNovember 25, 2023November 25, 2023
ACTIVITY PWID28:DTW205 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Pappu | Parvez IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance Posted onSeptember 18, 2022September 18, 2022 Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…
ACTIVITY PWID9:DTW109 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023