There is so much dust so we Plant grass to prevent road side dust













There is so much dust so we Plant grass to prevent road side dust













2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…
IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26
Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…