1.one new camera installation
2. Connector Change
3.IP Setup




1.one new camera installation
2. Connector Change
3.IP Setup




There was a damaged LIT. After regeneration work we have install a new LIT
Breaker installation for SCADA control Room Monitor Done
1. IP Setup
Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…