There was a damaged LIT. After regeneration work we have install a new LIT




There was a damaged LIT. After regeneration work we have install a new LIT




ScadaPack transfer from DTW-207 to 202 Done
DHAKA WASA TEAM ICE জীবনের ঝুকি নিয়ে ICE Team এভাবেই কাজ করে যাচ্ছে।
MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…