জীবনের ঝুকি নিয়ে ICE Team এভাবেই কাজ করে যাচ্ছে।


























Unused LIT Collect from DTW- 221,207,120,123 Done
There is so much dust so we Plant grass to prevent road side dust
DTW-221,217,123 Modbus communication Problem DTW-221 & 217 new serial communication cable install DTW- 123 VFD controller and Modbus serial communication cable check Done….
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: 27X M/C Magnetic Contact & AUX CONTACT UNIT Problem…
1 :MW03B 2: MW14A 3:MW08A 4: MW13B