Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.
25.11.2023 today I collect the LIT from DTW-113
Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…
Fiber Optical Maintenance Near DTW-103
New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
Specification SL No Specification criteria Specifications 1 Length of Tube 60mm 2 Inner Tube Diameter Inner 1.5mmOuter 2.2mm 3 After Recover Diameter 3mm…
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU