Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Similar Posts
ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS
DTW- 120 LIT And PIT Maintenance
Posted on
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
ACTIVITY | DAILY REPORTS | DTW | Pappu | Pending Issue
DTW- 113 UVR & UVR Related M/C checking complete.
Posted on
Problem: after power up time ACB do not close from the SCADA command.Problem found: 27X M/C Magnetic Contact & AUX CONTACT UNIT Problem…
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue
DTW-117 & 118 UVR Related M/C checking.
Posted on
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…
SCADA PACK REPORT IRP 1/2
Posted on
SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…
CCTV Maintenance At DTW-219
Posted on
1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating