Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…
PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
One Comment