Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU









Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
One Comment