Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,









Pages: 1 2
Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,
SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…
Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
There was so much dust
IRP-1 Office Building 1 Nos New Camera Install For Security Purpose
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done