1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






 
			1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
 
			Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust
 
			Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…
 
			SI DTW STATUS COMMENT 1 101 OK 2 102 OK 3 103 OK 4 104 OK 5 105 OK 6 106 OK 7…