Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
IRP-1. CC Camera Server Panel Cleaning Done
The Rehabilitation work is on going as long as 6 month. Any scenario of development of this DTW isn’t shown.After visiting this DTW,…
Problem: This MOV is abnormal working. MOV Open time & close time 0% to 100% value not showing. IRP-2 3V07A MOV Reset, reprogramming…