ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS IRP-2 Server Rak Installation Posted onNovember 16, 2022November 16, 2022 IRP-2 Sub-Station 1Nos New Server Rack Installation Done
ACTIVITY | CCTV | DTW | Jewel | NETWORK CONNECTIVITY | Parvez A new ONU install at DTW-201. Posted onSeptember 24, 2022September 24, 2022 Previous ONU frequently becomes unstable/hang. So replace the ONU.
ACTIVITY | CCTV CCTV Maintenance At DTW-206 Posted onOctober 19, 2022December 11, 2022 1.Cable connector change 2. IP Setup
Parvez | Product Specifications | Technical Papers GDR-CD01 UNDER VOLTAGE RELAY MANUAL PDF Posted onSeptember 26, 2022September 26, 2022
ACTIVITY PWID3:DTW103 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Pappu | REPORTS IRP-2 ALL LOP Panel Cleaning Posted onNovember 20, 2022November 20, 2022 There was so much dust