New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value matching now.




1.Camera IP reset 2.New IP install
DTW-106 CCTV Base Placement Done
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
1.Cable connector change 2. IP Setup
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…