ACTIVITY | DAILY REPORTS | Jewel | Pappu | ParvezInstrumentation Findings of Month (October,2022)
Posted onDaily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
IRP#2 Sludge drying bed A float switch checking complete.
Posted onProblem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…
- ACTIVITY | DTW | MONTHLY REPORTS | Pappu
DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.
Posted on
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTSCCTV Maintenance At DTW-105
Posted on2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
Fujikura New Model CT50 CT-50 High Precision Fiber Optic Cleaver Cutter The Most Robust Cleaver
Posted onSpecification SL No Specification criteria Specifications 1 Brand ‎‎FUJIKURA 2 Part Number ‎CT-50 3 Item Weight ‎3 pounds 4 Product Dimensions ‎3.2 x…