IRP-2 Sub-Station 1Nos New Server Rack Installation Done






IRP-2 Sub-Station 1Nos New Server Rack Installation Done






Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
IRP-1 Sand Filter FCP Panel Cleaning Done
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…