IRP-2 Sub-Station 1Nos New Server Rack Installation Done






IRP-2 Sub-Station 1Nos New Server Rack Installation Done






Float switch reconnection and rearrange. Now normal
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
1. IP Setup