IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.




IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.




IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.
Specification SL No Specification criteria Specifications 1 Length of Tube 60mm 2 Inner Tube Diameter Inner 1.5mmOuter 2.2mm 3 After Recover Diameter 3mm…
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
DTW-107 Radio Communication Problem Check