IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 ❎Level Sensor problem. 02…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…
Radio Communication Report October 2022 SL NO. DTW NO. Antenna Status RSSI/DCV Type Communication Status Remarks 01 101 13.2 16.4 ❎ Level fluctuate…
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done