  • ACTIVITY | Uncategorized

    DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message DTW-111 & 205 1nos Bullet camera maintenance interchanging internal hardware.Continue

  • ACTIVITY

    PWID51:DTW210 to 222 TJ Box sealing with silicon glue.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message PWID51:DTW210 to 222 TJ Box sealing with silicon glue.Continue

  • ACTIVITY | DTW | Parvez | Uncategorized

    WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter works

    Posted onNovember 25, 2023November 26, 2023

    26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…

    Listen to the Message WID585:Dtw-117 e-PRV CRD isn’t functioning properly. SEL manpower need to check.Now e-PRV CRD & flowmeter worksContinue

  • Uncategorized

    WID558: DTW-123 ELD problem solved. A repaired ELD installation done.

    Posted onNovember 25, 2023November 25, 2023

    Listen to the Message WID558: DTW-123 ELD problem solved. A repaired ELD installation done.Continue

  • Uncategorized

    PWID50:DTW209 to 207 TJ Box sealing with silicon glue.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message PWID50:DTW209 to 207 TJ Box sealing with silicon glue.Continue

  • Uncategorized

    PWID49:DTW120 to 113 TJ Box sealing with silicon glue.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message PWID49:DTW120 to 113 TJ Box sealing with silicon glue.Continue

  • Uncategorized

    PWID48:IRP1 to 119 TJ Box sealing with silicon glue.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message PWID48:IRP1 to 119 TJ Box sealing with silicon glue.Continue

  • ACTIVITY | DTW | Parvez | REPORTS

    DTW-113 LIT,PIT,FIT isolation due to regeneration

    Posted onNovember 23, 2023November 25, 2023

    Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…

    Listen to the Message DTW-113 LIT,PIT,FIT isolation due to regenerationContinue

  • CCTV | Parvez | REPORTS

    IRP-2 Sub-station optical fiber arrangement done.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message IRP-2 Sub-station optical fiber arrangement done.Continue

  • CCTV | DTW | Jewel | Parvez

    WID550: DTW-207 optical fiber maintenance.

    Posted onNovember 23, 2023November 23, 2023

    Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.

    Listen to the Message WID550: DTW-207 optical fiber maintenance.Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 … 196 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers