    DTW-113 LIT,PIT,FIT isolation due to regeneration

    Posted onNovember 23, 2023November 25, 2023

    Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…

    Listen to the Message DTW-113 LIT,PIT,FIT isolation due to regenerationContinue

  • CCTV | Parvez | REPORTS

    IRP-2 Sub-station optical fiber arrangement done.

    Posted onNovember 23, 2023November 23, 2023

    Listen to the Message IRP-2 Sub-station optical fiber arrangement done.Continue

  • CCTV | DTW | Jewel | Parvez

    WID550: DTW-207 optical fiber maintenance.

    Posted onNovember 23, 2023November 23, 2023

    Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.

    Listen to the Message WID550: DTW-207 optical fiber maintenance.Continue

  • DAILY REPORTS | DTW | Parvez

    WID577: DTW-204 ACB can not close from SCADA.

    Posted onNovember 22, 2023December 11, 2023

    Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…

    Listen to the Message WID577: DTW-204 ACB can not close from SCADA.Continue

  • Uncategorized

    WID558: DTW123 ELD installation and Leakage current check.

    Posted onNovember 22, 2023November 22, 2023

    Findings : ELD fuse burns when main UPS take input power. Action taken: 1. UPS replace but problem isn’t solved. 2. ELD replace…

    Listen to the Message WID558: DTW123 ELD installation and Leakage current check.Continue

  • ACTIVITY | Parvez

    PWID106: IRP-1 All FCP & LOP panel clean.

    Posted onNovember 21, 2023November 21, 2023

    Listen to the Message PWID106: IRP-1 All FCP & LOP panel clean.Continue

  • ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized

    WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.

    Posted onNovember 21, 2023November 22, 2023

    Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.

    Listen to the Message WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.Continue

  • Uncategorized

    WID567: DTW-203 & 208 Flow meter problem.

    Posted onNovember 20, 2023November 20, 2023

    Findings: Function Generator doesn’t work properly. Action Taken: 1. Physically check the connection 2. Check the pulse signal from SCADAPACK & pulse generator….

    Listen to the Message WID567: DTW-203 & 208 Flow meter problem.Continue

  • Uncategorized

    WID566: NAV-3 & NAV-4 Cameras aren’t shown in display.

    Posted onNovember 20, 2023November 20, 2023

    Findings: 1. Optical fiber are found damaged. Action Taken: 1. OTDR test . Cable disconnect at 0.7634 km. 2. Physically cable & TJ…

    Listen to the Message WID566: NAV-3 & NAV-4 Cameras aren’t shown in display.Continue

  • ACTIVITY

    PWID47:DTW104 to 111 TJ Box sealing with silicon glue.

    Posted onNovember 18, 2023November 18, 2023

    Listen to the Message PWID47:DTW104 to 111 TJ Box sealing with silicon glue.Continue

Page navigation

Previous PagePrevious 1 … 8 9 10 11 12 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers