Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
REPORTS

DTW215 Construction Status

Posted onDecember 20, 2022December 20, 2022

Google Map Location Lat/Long: 23°44’21.0″N 90°24’29.3″E Date: 2022.12.20 Observation: Recommendation: Pictures: Date: 2022.12.22 Date: 2022.12.24 Date: 2022.12.26

Listen to the Message DTW215 Construction StatusContinue

Dual Power Source for Optical Fiber Network at SKWP
Projects

Dual Power Source for Optical Fiber Network at SKWP

Posted onDecember 18, 2022December 19, 2022

What is Dual Power Source Dual power source means double power source to operate any electrical system. Necessity of Dual Power Source at…

Listen to the Message Dual Power Source for Optical Fiber Network at SKWPContinue

Optical Fiber recheck for DTW-122 To 123
Uncategorized

Optical Fiber recheck for DTW-122 To 123

Posted onDecember 17, 2022

Still Fiber Loss

Listen to the Message Optical Fiber recheck for DTW-122 To 123Continue

Optical Fiber Maintenance For DTW-115 To 119
Uncategorized

Optical Fiber Maintenance For DTW-115 To 119

Posted onDecember 17, 2022December 17, 2022

Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2

Listen to the Message Optical Fiber Maintenance For DTW-115 To 119Continue

DTW-102 Radio Antena Setting
Uncategorized

DTW-102 Radio Antena Setting

Posted onDecember 17, 2022December 17, 2022

DTW-102 Radio Antena Setting Done now radio signal normal and stable, DTW is remotely operatable

Listen to the Message DTW-102 Radio Antena SettingContinue

DTW-Camera Lens Cleaning
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW-Camera Lens Cleaning

Posted onDecember 14, 2022December 18, 2022

DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.

Listen to the Message DTW-Camera Lens CleaningContinue

DTW-120 CCTV Maintenance
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

DTW-120 CCTV Maintenance

Posted onDecember 13, 2022December 13, 2022

DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2

Listen to the Message DTW-120 CCTV MaintenanceContinue

IRP-2 Sub-Station Re cleaning
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

IRP-2 Sub-Station Re cleaning

Posted onDecember 13, 2022December 13, 2022

There was so much dust

Listen to the Message IRP-2 Sub-Station Re cleaningContinue

DTW-202,211,213 VFD,RTU & CCTV Panel Cleaning
Uncategorized

DTW-202,211,213 VFD,RTU & CCTV Panel Cleaning

Posted onDecember 13, 2022December 13, 2022

There was so much dust

Listen to the Message DTW-202,211,213 VFD,RTU & CCTV Panel CleaningContinue

CCTV modification work for Dual power source
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

CCTV modification work for Dual power source

Posted onDecember 13, 2022December 13, 2022

CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.

Listen to the Message CCTV modification work for Dual power sourceContinue

Page navigation

Previous PagePrevious 1 … 16 17 18 19 20 … 59 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers