  • IRP-2 ALL LOP Panel Cleaning
    ACTIVITY | DAILY REPORTS | Pappu | REPORTS

    IRP-2 ALL LOP Panel Cleaning

    Posted onNovember 20, 2022November 20, 2022

    There was so much dust

    Listen to the Message IRP-2 ALL LOP Panel CleaningContinue

  • ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

    DTW-221 Modbus Serial communication Problem

    Posted onNovember 20, 2022November 20, 2022

    when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…

    Listen to the Message DTW-221 Modbus Serial communication ProblemContinue

  • DTW-211 CCTV power is taken from main ups
    ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

    DTW-211 CCTV power is taken from main ups

    Posted onNovember 20, 2022November 20, 2022

    DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.

    Listen to the Message DTW-211 CCTV power is taken from main upsContinue

  • IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

    IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change

    Posted onNovember 20, 2022November 20, 2022

    Previous control cable is damaged by ant .so we replace new control cable

    Listen to the Message IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable ChangeContinue

  • IRP-2 Server Rack Installation and Optical Fiber Rejoin
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS

    IRP-2 Server Rack Installation and Optical Fiber Rejoin

    Posted onNovember 17, 2022November 17, 2022

    IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

    Listen to the Message IRP-2 Server Rack Installation and Optical Fiber RejoinContinue

  • IRP-1 CC Camera Server Panel Cleaning
    ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS

    IRP-1 CC Camera Server Panel Cleaning

    Posted onNovember 16, 2022November 16, 2022

    IRP-1. CC Camera Server Panel Cleaning Done

    Listen to the Message IRP-1 CC Camera Server Panel CleaningContinue

  • IRP-2 Server Rak Installation
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    IRP-2 Server Rak Installation

    Posted onNovember 16, 2022November 16, 2022

    IRP-2 Sub-Station 1Nos New Server Rack Installation Done

    Listen to the Message IRP-2 Server Rak InstallationContinue

  • DTW-104,105,106,107 CLEANING WORK
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    DTW-104,105,106,107 CLEANING WORK

    Posted onNovember 15, 2022November 15, 2022

    DTW-104,105,106,107 Cleaning Done

    Listen to the Message DTW-104,105,106,107 CLEANING WORKContinue

  • Uncategorized

    Demand for Goods

    Posted onNovember 15, 2022November 28, 2022

    SL. No Item Name Unit Qty. Remarks 1 Magnetic Contactor Nos 3 2 Float Switch Nos 2 3 OGR Supply Fan Motor Nos…

    Listen to the Message Demand for GoodsContinue

  • Uncategorized

    Chlorine Weighing Scale Callibration

    Posted onNovember 15, 2022November 15, 2022

    Listen to the Message Chlorine Weighing Scale CallibrationContinue

Page navigation

Previous PagePrevious 1 … 20 21 22 23 24 … 127 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers