PIT maintenance work report (IRP-2)
ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

PIT maintenance work report (IRP-2)

Posted onNovember 8, 2022November 8, 2022

PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

Listen to the Message PIT maintenance work report (IRP-2)Continue

DTW-106 CC Camera Establishment
ACTIVITY | CCTV | DAILY REPORTS | DTW

DTW-106 CC Camera Establishment

Posted onNovember 7, 2022December 26, 2022

1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity

Listen to the Message DTW-106 CC Camera EstablishmentContinue

DTW-114 CC Camera Install
ACTIVITY | CCTV | DAILY REPORTS | DTW

DTW-114 CC Camera Install

Posted onNovember 6, 2022November 6, 2022

1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation

Listen to the Message DTW-114 CC Camera InstallContinue

DTW-113 Scada Pack Install
ACTIVITY | DAILY REPORTS | DTW

DTW-113 Scada Pack Install

Posted onNovember 6, 2022November 6, 2022

DTW-113 Scada Pack Programing And Install Done

Listen to the Message DTW-113 Scada Pack InstallContinue

DTW-102 Scada Pack Install
ACTIVITY | DAILY REPORTS | DTW

DTW-102 Scada Pack Install

Posted onNovember 6, 2022November 6, 2022

DTW-102 Scada Pack Programing And Install Done

Listen to the Message DTW-102 Scada Pack InstallContinue

DTW-211 Serial Communication Cable check and Rejoin
ACTIVITY | DTW | Parvez

DTW-211 Serial Communication Cable check and Rejoin

Posted onNovember 5, 2022November 5, 2022

DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal

Listen to the Message DTW-211 Serial Communication Cable check and RejoinContinue

DTW-217 and 103 VFD controller Drive Installation Done
ACTIVITY | DTW | Parvez

DTW-217 and 103 VFD controller Drive Installation Done

Posted onNovember 5, 2022November 5, 2022

1.VFD Controller Installation 2.Modbus Serial Communication Cable Check

Listen to the Message DTW-217 and 103 VFD controller Drive Installation DoneContinue

DTW- 106 CCTV Pool And UTP Cable Installation
ACTIVITY | CCTV | DTW | Pappu

DTW- 106 CCTV Pool And UTP Cable Installation

Posted onNovember 5, 2022November 5, 2022

1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation

Listen to the Message DTW- 106 CCTV Pool And UTP Cable InstallationContinue

Uncategorized

HP ZCentral 4R 1U Rack Workstation

Posted onNovember 5, 2022December 11, 2022

Parameters Specification Processor Intel Xeon W-2223 (3.6 GHz base frequency, 4 cores) up to 3.9 GHz with Intel® Turbo Boost Technology, 8.25 MB cache…

Listen to the Message HP ZCentral 4R 1U Rack WorkstationContinue

Product Specifications

Equipment’s List for PWTP [Category Wise]

Posted onNovember 5, 2022December 11, 2022

PLC SL NO ITEM NAME BRAND NAME MODEL TYPE 1 Processor module, Modicon M340 automation platform, max 1024 discrete + 256 analog I/O,…

Listen to the Message Equipment’s List for PWTP [Category Wise]Continue

Page navigation

Previous PagePrevious 1 … 23 24 25 26 27 … 59 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers