PIT maintenance work report (IRP-2)
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity
1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation
DTW-113 Scada Pack Programing And Install Done
DTW-102 Scada Pack Programing And Install Done
DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal
1.VFD Controller Installation 2.Modbus Serial Communication Cable Check
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
Parameters Specification Processor Intel Xeon W-2223 (3.6 GHz base frequency, 4 cores) up to 3.9 GHz with Intel® Turbo Boost Technology, 8.25 MB cache…
PLC SL NO ITEM NAME BRAND NAME MODEL TYPE 1 Processor module, Modicon M340 automation platform, max 1024 discrete + 256 analog I/O,…