  • PIT maintenance work report (IRP-2)
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez

    PIT maintenance work report (IRP-2)

    Posted onNovember 8, 2022November 8, 2022

    PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist

    Listen to the Message PIT maintenance work report (IRP-2)Continue

  • DTW-106 CC Camera Establishment
    ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW-106 CC Camera Establishment

    Posted onNovember 7, 2022December 26, 2022

    1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity

    Listen to the Message DTW-106 CC Camera EstablishmentContinue

  • DTW-114 CC Camera Install
    ACTIVITY | CCTV | DAILY REPORTS | DTW

    DTW-114 CC Camera Install

    Posted onNovember 6, 2022November 6, 2022

    1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation

    Listen to the Message DTW-114 CC Camera InstallContinue

  • DTW-113 Scada Pack Install
    ACTIVITY | DAILY REPORTS | DTW

    DTW-113 Scada Pack Install

    Posted onNovember 6, 2022November 6, 2022

    DTW-113 Scada Pack Programing And Install Done

    Listen to the Message DTW-113 Scada Pack InstallContinue

  • DTW-102 Scada Pack Install
    ACTIVITY | DAILY REPORTS | DTW

    DTW-102 Scada Pack Install

    Posted onNovember 6, 2022November 6, 2022

    DTW-102 Scada Pack Programing And Install Done

    Listen to the Message DTW-102 Scada Pack InstallContinue

  • DTW-211 Serial Communication Cable check and Rejoin
    ACTIVITY | DTW | Parvez

    DTW-211 Serial Communication Cable check and Rejoin

    Posted onNovember 5, 2022November 5, 2022

    DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal

    Listen to the Message DTW-211 Serial Communication Cable check and RejoinContinue

  • DTW-217 and 103 VFD controller Drive Installation Done
    ACTIVITY | DTW | Parvez

    DTW-217 and 103 VFD controller Drive Installation Done

    Posted onNovember 5, 2022November 5, 2022

    1.VFD Controller Installation 2.Modbus Serial Communication Cable Check

    Listen to the Message DTW-217 and 103 VFD controller Drive Installation DoneContinue

  • DTW- 106 CCTV Pool And UTP Cable Installation
    ACTIVITY | CCTV | DTW | Pappu

    DTW- 106 CCTV Pool And UTP Cable Installation

    Posted onNovember 5, 2022November 5, 2022

    1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation

    Listen to the Message DTW- 106 CCTV Pool And UTP Cable InstallationContinue

  • Uncategorized

    HP ZCentral 4R 1U Rack Workstation

    Posted onNovember 5, 2022December 11, 2022

    Parameters Specification Processor Intel Xeon W-2223 (3.6 GHz base frequency, 4 cores) up to 3.9 GHz with Intel® Turbo Boost Technology, 8.25 MB cache…

    Listen to the Message HP ZCentral 4R 1U Rack WorkstationContinue

  • Product Specifications

    Equipment’s List for PWTP [Category Wise]

    Posted onNovember 5, 2022December 11, 2022

    PLC SL NO ITEM NAME BRAND NAME MODEL TYPE 1 Processor module, Modicon M340 automation platform, max 1024 discrete + 256 analog I/O,…

    Listen to the Message Equipment’s List for PWTP [Category Wise]Continue

Page navigation

Previous PagePrevious 1 … 24 25 26 27 28 … 198 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers