  • DTW-103 VFD Controller Install
    ACTIVITY | DTW | DTW103 | Parvez

    DTW-103 VFD Controller Install

    Posted onNovember 3, 2022November 3, 2022

    1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done

    Listen to the Message DTW-103 VFD Controller InstallContinue

  • DTW-106 CCTV Base Placement
    ACTIVITY | CCTV | DTW

    DTW-106 CCTV Base Placement

    Posted onNovember 3, 2022November 3, 2022

    DTW-106 CCTV Base Placement Done

    Listen to the Message DTW-106 CCTV Base PlacementContinue

  • DAILY REPORTS | REPORTS

    MOV REPORT 2022

    Posted onNovember 3, 2022December 11, 2022

    MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…

    Listen to the Message MOV REPORT 2022Continue

  • ACTIVITY | DTW

    DTW-107 Radio Communication Problem

    Posted onNovember 2, 2022November 2, 2022

    DTW-107 Radio Communication Problem Check

    Listen to the Message DTW-107 Radio Communication ProblemContinue

  • DTW- 123 CCTV Maintenance
    ACTIVITY | CCTV | DTW

    DTW- 123 CCTV Maintenance

    Posted onNovember 2, 2022November 2, 2022

    Listen to the Message DTW- 123 CCTV MaintenanceContinue

  • DTW-202 CCTV Maintenance
    ACTIVITY | CCTV | DTW

    DTW-202 CCTV Maintenance

    Posted onNovember 2, 2022November 2, 2022

    1.one new camera installation 2. Connector Change 3.IP Setup

    Listen to the Message DTW-202 CCTV MaintenanceContinue

  • DTW – 111 LIT Maintenance Work Complete.
    ACTIVITY | DAILY REPORTS | DTW | Pappu

    DTW – 111 LIT Maintenance Work Complete.

    Posted onNovember 1, 2022November 1, 2022

    Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷

    Listen to the Message DTW – 111 LIT Maintenance Work Complete.Continue

  • LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.
    ACTIVITY | DTW | Jewel | Pappu

    LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.

    Posted onOctober 29, 2022October 29, 2022

    Listen to the Message LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK.Continue

  • Uncategorized

    MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)

    Posted onOctober 29, 2022October 29, 2022

    SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…

    Listen to the Message MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)Continue

  • DTW | MONTHLY REPORTS | Parvez | REPORTS

    LIT & PIT report October-2022

    Posted onOctober 29, 2022October 29, 2022

    DTW NO. LIT PIT Comments DTW NO. LIT PIT Comments 101 NOT OK OK 201 OK OK 102 OK OK 202 NOT OK…

    Listen to the Message LIT & PIT report October-2022Continue

Page navigation

Previous PagePrevious 1 … 25 26 27 28 29 … 198 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers