VFD Report 2022

Posted onOctober 25, 2022December 11, 2022

VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…

Listen to the Message VFD Report 2022Continue

ACTIVITY | DAILY REPORTS | REPORTS

PIT Report 2022

Posted onOctober 24, 2022December 11, 2022

PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…

Listen to the Message PIT Report 2022Continue

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.
ACTIVITY | DAILY REPORTS | DTW | Pappu

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.

Posted onOctober 24, 2022October 24, 2022

DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…

Listen to the Message DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Continue

Product Specifications

Autonics Temperature Controller

Posted onOctober 24, 2022

Specifications Ref https://www.autonics.com/series/3000365

Listen to the Message Autonics Temperature ControllerContinue

CCTV Maintenance At DTW-101
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

CCTV Maintenance At DTW-101

Posted onOctober 23, 2022December 11, 2022

1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup

Listen to the Message CCTV Maintenance At DTW-101Continue

CCTV Maintenance At DTW-102
ACTIVITY | CCTV | DTW | Uncategorized

CCTV Maintenance At DTW-102

Posted onOctober 23, 2022October 23, 2022

1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang

Listen to the Message CCTV Maintenance At DTW-102Continue

Fiber Optical Maintenance
ACTIVITY | CCTV | OFFICIAL NOTE | Uncategorized

Fiber Optical Maintenance

Posted onOctober 23, 2022October 23, 2022

Fiber Optical Maintenance Near DTW-103

Listen to the Message Fiber Optical MaintenanceContinue

EPRV Work DTW-117 By ICE Team & SEL
ACTIVITY | DTW | DTW103

EPRV Work DTW-117 By ICE Team & SEL

Posted onOctober 22, 2022October 22, 2022

DTW-117

Listen to the Message EPRV Work DTW-117 By ICE Team & SELContinue

DTW-115 LIT Installing
ACTIVITY | DTW

DTW-115 LIT Installing

Posted onOctober 22, 2022October 23, 2022

Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU

Listen to the Message DTW-115 LIT InstallingContinue

CCTV Maintenance At DTW-222
ACTIVITY | CCTV | DTW

CCTV Maintenance At DTW-222

Posted onOctober 22, 2022October 22, 2022

1.UTP Cable Change 2.Connector Change 3.IP Setup

Listen to the Message CCTV Maintenance At DTW-222Continue

Page navigation

Previous PagePrevious 1 … 26 27 28 29 30 … 59 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers