    FIT Report 2022

    Posted onOctober 25, 2022December 11, 2022

    FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…

    Listen to the Message FIT Report 2022Continue

  • ACTIVITY | NETWORK CONNECTIVITY

    Radio Communication Report 2022

    Posted onOctober 25, 2022December 11, 2022

    Radio Communication Report October 2022 SL NO. DTW NO. Antenna Status RSSI/DCV Type Communication Status Remarks 01 101  13.2 16.4 ❎ Level fluctuate…

    Listen to the Message Radio Communication Report 2022Continue

  • ACTIVITY | DAILY REPORTS | REPORTS

    SCADAPACK Report 2022

    Posted onOctober 25, 2022December 11, 2022

    SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…

    Listen to the Message SCADAPACK Report 2022Continue

  • ACTIVITY | DAILY REPORTS | REPORTS

    VFD Report 2022

    Posted onOctober 25, 2022December 11, 2022

    VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…

    Listen to the Message VFD Report 2022Continue

  • ACTIVITY | DAILY REPORTS | REPORTS

    PIT Report 2022

    Posted onOctober 24, 2022December 11, 2022

    PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…

    Listen to the Message PIT Report 2022Continue

  • DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.
    ACTIVITY | DAILY REPORTS | DTW | Pappu

    DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.

    Posted onOctober 24, 2022October 24, 2022

    DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…

    Listen to the Message DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Continue

  • Product Specifications

    Autonics Temperature Controller

    Posted onOctober 24, 2022

    Specifications Ref https://www.autonics.com/series/3000365

    Listen to the Message Autonics Temperature ControllerContinue

  • CCTV Maintenance At DTW-101
    ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS

    CCTV Maintenance At DTW-101

    Posted onOctober 23, 2022December 11, 2022

    1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup

    Listen to the Message CCTV Maintenance At DTW-101Continue

  • CCTV Maintenance At DTW-102
    ACTIVITY | CCTV | DTW | Uncategorized

    CCTV Maintenance At DTW-102

    Posted onOctober 23, 2022October 23, 2022

    1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang

    Listen to the Message CCTV Maintenance At DTW-102Continue

  • Fiber Optical Maintenance
    ACTIVITY | CCTV | OFFICIAL NOTE | Uncategorized

    Fiber Optical Maintenance

    Posted onOctober 23, 2022October 23, 2022

    Fiber Optical Maintenance Near DTW-103

    Listen to the Message Fiber Optical MaintenanceContinue

Page navigation

Previous PagePrevious 1 … 26 27 28 29 30 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers