Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • Uncategorized

    DTW 223 CCTV PILLAR ARRANGEMENT & CABLING WORK COMPLETE

    Posted onSeptember 19, 2022September 19, 2022

    Listen to the Message DTW 223 CCTV PILLAR ARRANGEMENT & CABLING WORK COMPLETEContinue

  • Uncategorized

    DTW#223 CCTV

    Posted onSeptember 19, 2022September 19, 2022

    Listen to the Message DTW#223 CCTVContinue

  • OGR booster pump D winding temperature & Bearing temperature sensor checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    OGR booster pump D winding temperature & Bearing temperature sensor checking.

    Posted onSeptember 18, 2022September 18, 2022

    Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….

    Listen to the Message OGR booster pump D winding temperature & Bearing temperature sensor checking.Continue

  • IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance
    ACTIVITY | DAILY REPORTS | Pappu | Parvez

    IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor Maintenance

    Posted onSeptember 18, 2022September 18, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 NOS float switch problem found. A good sensor in HIHI position is replaced with…

    Listen to the Message IRP-2 Sludge Drying Bed Pump-A Float Type Level Sensor MaintenanceContinue

  • DTW-110 Pump inspection & ready to run up.
    ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez

    DTW-110 Pump inspection & ready to run up.

    Posted onSeptember 18, 2022September 18, 2022

    Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…

    Listen to the Message DTW-110 Pump inspection & ready to run up.Continue

  • IRP#2 Sludge drying bed A float switch checking complete.
    ACTIVITY | DAILY REPORTS | Pappu

    IRP#2 Sludge drying bed A float switch checking complete.

    Posted onSeptember 17, 2022September 17, 2022

    Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…

    Listen to the Message IRP#2 Sludge drying bed A float switch checking complete.Continue

  • Chlorine cylinder lode shell checking and maintenance.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez

    Chlorine cylinder lode shell checking and maintenance.

    Posted onSeptember 17, 2022September 17, 2022

    Problem found: lode shell connection terminal circuit problem found.

    Listen to the Message Chlorine cylinder lode shell checking and maintenance.Continue

  • Product Specifications

    PRO ECO 240W 24V 10A

    Posted onSeptember 17, 2022September 25, 2022

    Brand Name: Weidmuller Product Name: Switch-mode power supply Model No/Part No: PRO ECO 240W 24V 10A Country of Origin: Country of Shipment: As…

    Listen to the Message PRO ECO 240W 24V 10AContinue

  • IRP1 Sludge drying bed float switch checking.
    ACTIVITY | DAILY REPORTS | Jewel | Pappu | Pending Issue

    IRP1 Sludge drying bed float switch checking.

    Posted onSeptember 15, 2022October 12, 2022

    Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে  HiHiLoLo সিগনাল…

    Listen to the Message IRP1 Sludge drying bed float switch checking.Continue

  • REPORTS

    Panel With Component List of SKWP

    Posted onSeptember 15, 2022September 25, 2022

    OGR Electrical Room SL NO REMARKS 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19…

    Listen to the Message Panel With Component List of SKWPContinue

Page navigation

Previous PagePrevious 1 … 38 39 40 41 42 … 198 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers