Optical Fiber restoration work at DTW103
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…
-
OGR Booster pump (E) checking complete.
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…
-
-
-
-
-
Electrical Team Monthly work plan(September-22)
Sl No. Date Location Task Name Work update Remarks 2 9/3/2022 33 KV interlink HT Network visual checking & Monthly tree trimming work….
-
-