  • DTW-118,122,220 & 205 automatic start-stop problem solved
    ACTIVITY | Parvez | REPORTS

    DTW-118,122,220 & 205 automatic start-stop problem solved

    Posted onJuly 30, 2022August 1, 2022

    Due to solving those problems : Modbus ground connection check. VFD frequency regulator loose connection check. SPD check . RJ-45 connector check. Cable…

    Listen to the Message DTW-118,122,220 & 205 automatic start-stop problem solvedContinue

  • Daily Work List July 2022
    MONTHLY REPORTS

    Daily Work List July 2022

    Posted onJuly 28, 2022August 14, 2022

    Listen to the Message Daily Work List July 2022Continue

  • Technical Papers

    Batteries in Series and Parallel Connections (Battery Packs)

    Posted onJuly 27, 2022July 27, 2022

    Making larger battery packs is often required to extend backup time or increase voltage to make certain devices work. For example, if you…

    Listen to the Message Batteries in Series and Parallel Connections (Battery Packs)Continue

  • Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • Product Specifications

    Protected: TOTEN 12U Wall Mount Server Rack

    Posted onJuly 27, 2022August 4, 2022

    There is no excerpt because this is a protected post.

    Listen to the Message Protected: TOTEN 12U Wall Mount Server RackContinue

  • Instrumentation Findings of Month (July,2022)
    MONTHLY REPORTS

    Instrumentation Findings of Month (July,2022)

    Posted onJuly 27, 2022September 4, 2022

    SL/NO PROBLEMS TAG LOCATION REMARK 1 When the pump runs, the pump Motor + MOV runs together.  Which does not follow the normal…

    Listen to the Message Instrumentation Findings of Month (July,2022)Continue

  • IRP-1 & 2 all DTW CCTV UPS maintenance, replace & install
    MONTHLY REPORTS | Parvez

    IRP-1 & 2 all DTW CCTV UPS maintenance, replace & install

    Posted onJuly 27, 2022August 14, 2022

    Savar-Keraniganj Well Field Plant IRP-1 & 2 all DTW’s  CCTV UPS maintenance , replace & install SL No. DTW No. Problem Activity Comment…

    Listen to the Message IRP-1 & 2 all DTW CCTV UPS maintenance, replace & installContinue

  • DTW-120 CCTV UPS INSTALL
    Uncategorized

    DTW-120 CCTV UPS INSTALL

    Posted onJuly 27, 2022July 27, 2022

    Listen to the Message DTW-120 CCTV UPS INSTALLContinue

  • DAILY REPORTS | Jewel

    DTW101 CCTV UPS installation

    Posted onJuly 26, 2022July 27, 2022

    Listen to the Message DTW101 CCTV UPS installationContinue

  • Product Specifications

    Video wall UD series 138 cm LH55UDEHLBB

    Posted onJuly 21, 2022July 31, 2022

    Specifications SL. No Details Specification Display 1 Screen size 55″ 2 Resolution 1920 x 1080 3 Active Display Size (H x V) 1209.6…

    Listen to the Message Video wall UD series 138 cm LH55UDEHLBBContinue

Page navigation

Previous PagePrevious 1 … 49 50 51 52 53 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers