ADDM: Address Conversion
Technical Papers

ADDM: Address Conversion

Posted onJuly 18, 2022July 26, 2022

Function Description The ADDM function is used to convert a character string into an address that can be used directly by the following…

Listen to the Message ADDM: Address ConversionContinue

ACTIVITY | Parvez | Technical Papers

Frequency Regulator Value at different position

Posted onJuly 16, 2022July 31, 2022

Listen to the Message Frequency Regulator Value at different positionContinue

Uncategorized

IRP-2 inlet FIT-3001 maintenance & reinstall

Posted onJuly 11, 2022July 11, 2022

Listen to the Message IRP-2 inlet FIT-3001 maintenance & reinstallContinue

Uncategorized

DTW-205 VFD start/stop problem in remote state has been solved

Posted onJuly 11, 2022July 11, 2022

Listen to the Message DTW-205 VFD start/stop problem in remote state has been solvedContinue

GIMAC-I power meter reset, reconfigure & new cable install at dtw-207
Uncategorized

GIMAC-I power meter reset, reconfigure & new cable install at dtw-207

Posted onJuly 11, 2022July 11, 2022

Listen to the Message GIMAC-I power meter reset, reconfigure & new cable install at dtw-207Continue

Uncategorized

IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)

Posted onJuly 7, 2022July 7, 2022

Listen to the Message IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)Continue

ACTIVITY | Pappu

FIT-3001 Maintenance

Posted onJuly 5, 2022July 26, 2022

After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…

Listen to the Message FIT-3001 MaintenanceContinue

REPORTS

Report: IRP-2 Dome Camera and Panel preventive maintenance.

Posted onJuly 5, 2022July 5, 2022

Equipment Status Dome Camera: All Ok Power Supply: Ok Ring Switch: Ok Findings: After raining water found in panel. Suggestion: Solution for water…

Listen to the Message Report: IRP-2 Dome Camera and Panel preventive maintenance.Continue

REPORTS

Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.

Posted onJuly 5, 2022July 5, 2022

Cleaning Status: Completed. Findings: No problem found.

Listen to the Message Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.Continue

REPORTS

Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.

Posted onJuly 5, 2022July 5, 2022

Cleaning Status: Completed. Findings: No problem found.

Listen to the Message Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Continue

Page navigation

Previous PagePrevious 1 … 50 51 52 53 54 … 59 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers