  • ADDM: Address Conversion
    Technical Papers

    ADDM: Address Conversion

    Posted onJuly 18, 2022July 26, 2022

    Function Description The ADDM function is used to convert a character string into an address that can be used directly by the following…

    Listen to the Message ADDM: Address ConversionContinue

  • ACTIVITY | Parvez | Technical Papers

    Frequency Regulator Value at different position

    Posted onJuly 16, 2022July 31, 2022

    Listen to the Message Frequency Regulator Value at different positionContinue

  • Uncategorized

    IRP-2 inlet FIT-3001 maintenance & reinstall

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message IRP-2 inlet FIT-3001 maintenance & reinstallContinue

  • Uncategorized

    DTW-205 VFD start/stop problem in remote state has been solved

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message DTW-205 VFD start/stop problem in remote state has been solvedContinue

  • GIMAC-I power meter reset, reconfigure & new cable install at dtw-207
    Uncategorized

    GIMAC-I power meter reset, reconfigure & new cable install at dtw-207

    Posted onJuly 11, 2022July 11, 2022

    Listen to the Message GIMAC-I power meter reset, reconfigure & new cable install at dtw-207Continue

  • Uncategorized

    IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)

    Posted onJuly 7, 2022July 7, 2022

    Listen to the Message IRP-2 Sandfilter Bluer’s VFD (3MO1A & 3MO1B) cleaning, checking and maintenance complete (02/07/2022)Continue

  • ACTIVITY | Pappu

    FIT-3001 Maintenance

    Posted onJuly 5, 2022July 26, 2022

    After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…

    Listen to the Message FIT-3001 MaintenanceContinue

  • REPORTS

    Report: IRP-2 Dome Camera and Panel preventive maintenance.

    Posted onJuly 5, 2022July 5, 2022

    Equipment Status Dome Camera: All Ok Power Supply: Ok Ring Switch: Ok Findings: After raining water found in panel. Suggestion: Solution for water…

    Listen to the Message Report: IRP-2 Dome Camera and Panel preventive maintenance.Continue

  • REPORTS

    Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.

    Posted onJuly 5, 2022July 5, 2022

    Cleaning Status: Completed. Findings: No problem found.

    Listen to the Message Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.Continue

  • REPORTS

    Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.

    Posted onJuly 5, 2022July 5, 2022

    Cleaning Status: Completed. Findings: No problem found.

    Listen to the Message Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Continue

Page navigation

Previous PagePrevious 1 … 51 52 53 54 55 … 208 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers