FIT-3001 Maintenance
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
-
Report: IRP-2 Dome Camera and Panel preventive maintenance.
Equipment Status Dome Camera: All Ok Power Supply: Ok Ring Switch: Ok Findings: After raining water found in panel. Suggestion: Solution for water…
-
Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.
Cleaning Status: Completed. Findings: No problem found.
-
Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
Cleaning Status: Completed. Findings: No problem found.
-
Report: IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.
Device Status OLT : OK UPS: OK ONU: Ok POE Switch : OK Findings: Too much dust inside all device. Suggestion: New separate…
-
-
IRP-1 DTW (101 to123) SCADAPACK, TRIO JR,LIT & PIT REPORT.
DTW SCADAPACK TRIO JR LIT PIT COMMENTS 101 OK OK OK OK 102 OK OK NOT OK OK 103 OK OK OK OK…
-
Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )
SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…
-