-
-
IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
RTU Panel cleaning completed.
-
-
IRP-2 Dome Camera and Panel preventive maintenance.
All Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.
-
UVR & ELD monthly cleaning
In all DTW, there have lot of essential electronic devices that protect & control our system. UVR & ELD are playing a important…
-
-
-
IRP-2 SCADA Room RTU and Server Panel Preventive Maintenance.
All panel cleaning completed.
-
IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)
DTW – 107, 109, 119 CCTV panel cleaning completed. DTW 115, 118 DTW 114, 118
-
