DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done









DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done









Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4