There was a damaged LIT. After regeneration work we have install a new LIT
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup
1.5Nos new camera installation 2.1Nos New PoE Switch Installation 3.1Nos New Onu Installation 4.CCTV Server Panel Installation 5.Optical Fiver Connectivity