Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
1.DTW-114 1Nos Camera Install Done 2.New UTP Cable Install 3.Connector Change Now DTW-114 5Nos Camera in Operation
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…