1 :MW03B 2: MW14A 3:MW08A 4: MW13B
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
To solve this problem, we increase the height 1 meter more and change the direction.
DTW-102 Scada Pack Programing And Install Done
Checking and maintenance of 2 field pumps completed.