IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
CL2 INSTRUMENT LIST SL NO Product Name Model Brand Panel Power Meter KDX-AC Light Star Top Touch Operation Panel XTOP12TS M2I Corporation Gas…
problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…