Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done





26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
 
			Due To Strom the optical fiber cable fall down and damage near DTW-121 to 122 now everything is normal
 
			 
			1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
 
			SCADA Room & Work Station CPU cleaning