Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done
DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.
PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…
Unable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
DTW-113 Scada Pack Programing And Install Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: 27X M/C Magnetic Contact & AUX CONTACT UNIT Problem…