1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity












1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
Connector change IP Setting
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
Dtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning
PIT Interlock