1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity












1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity
IRP-1 All LOP Panel Cleaning Done
The Rehabilitation work is on going as long as 6 month. Any scenario of development of this DTW isn’t shown.After visiting this DTW,…