DTW-120 PIT maintenance Done.
Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada
LIT Do Not Down in The Boring After 7 Meter









DTW-120 PIT maintenance Done.
Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada
LIT Do Not Down in The Boring After 7 Meter
1. connector change 2. IP Setup
1.1 Nos New Camera Installation . 2. IP Setup
Specification SL No Specification criteria Specifications 1 Model PLC-104-ST-25-15 2 Configuration Type Configuration Type 3 Package Style Steel Tube, Bare Fiber 4 Fiber…
problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…