DTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to dtw-121. And the light visible in dtw-121. Reason for Pending: Even though light signal passes easily but ONU shows Los. Our next steps: Change spliter in dtw-121 & apply new onu as test purpose.
Similar Posts
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
IRP-1 sand filter “E” ultrasonic level transmitter installing.
Posted on
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
IRP-1/2 Optical Fiber Maintenance Report
Posted on
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
DTW-106 CCTV Base Placement
Posted on
DTW-106 CCTV Base Placement Done
CCTV Maintenance At DTW-206
Posted on
1. IP Setup
ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized
WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.
Posted on
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
IRP-1 All DTW NEV Voltage check
Posted on