There was a damaged LIT. After regeneration work we have install a new LIT
Similar Posts
Field Pump Checking & Maintenance.
Posted on
Checking and maintenance of 2 field pumps completed.
Report: IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
Posted on
Cleaning Status: Completed. Findings: No problem found.
VFD Report 2022
Posted on
VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
OPTICAL FIBER MAINTENANCE AT DTW-104
Posted on
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…