Similar Posts
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning
Posted on
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.
ACTIVITY | DAILY REPORTS | DTW | Parvez | REPORTS
DTW-211 CCTV power is taken from main ups
Posted on
DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.
ACTIVITY | DAILY REPORTS | DTW | Pappu
Unused & damage LIT sensor collects complete from DTW 105,106,115,203 & 212
Posted on
Unused & damage LIT sensor collects complete from DTW 105 – 1 nos DTW 106 – 1 nos & new lit sensor install.DTW…
IRP-1 SDB Additional Dewatering Pump Fault check
Posted on
IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
FIT Report 2022
Posted on
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
IRP-1 sand filter “E” ultrasonic level transmitter installing.
Posted on
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…