Modbus Serial communication cable check Complete. No problem Found in the Field
LIT Do Not Down in The Boring After 10 Meter
Modbus Serial communication cable check Complete. No problem Found in the Field
LIT Do Not Down in The Boring After 10 Meter
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup