IRP-1 All sandfilter ultrasonic sensor cleaning
Posted on
IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Instrumentation Findings of Month (October,2022)
Posted on
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
Radio Communication Report 2022
Posted on
Radio Communication Report October 2022 SL NO. DTW NO. Antenna Status RSSI/DCV Type Communication Status Remarks 01 101 13.2 16.4 ❎ Level fluctuate…
IRP#2 Sludge drying bed A float switch checking complete.
Posted on
Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…