IRP-1 All LOP Panel Cleaning Done









IRP-1 All LOP Panel Cleaning Done
DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)
Daily Work Plan September 2022ð SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: â PAPPU,…
SPECIFICATION OF COOLING FAN (RTU PANEL) SL No Specification criteria Specifications 1 Brand Name: FULLTECH 2 Model Number UF12B23-H 3 Place of Origin:…
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 âLevel Sensor problem. 02…