IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
 
			CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
 
			1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done
 
			DTW #120,121,122 VFD , RTU AND CCTV PANEL CLEANING COMPLETE