IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little weak found but workable) Now Normal
Similar Posts
Fiber Optic Cable Closure Outdoor Joint Box
Posted on
Fiber Optic Cable Closure Outdoor Joint Box Indication Description Dimension (length x width x height) 435mm x 190mm x 120mm Shock-resistance >=20N.m Type…
IRP#2 Sludge drying bed A float switch checking complete.
Posted on
Problem: SCADA always showing HI signal. Problem found: 1 Nos float switch problem. HI signal float switch problem & float switch connection terminal…
DTW-223 5Nos CCTV Maintenance
Posted on
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
IRP-2 Sub-Station Re cleaning
Posted on
There was so much dust
DTW-115 LIT Installing
Posted on
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
DTW-123 Inverter Fault and VFD do not Power Up
Posted on
1.VFD Controller Damage 2. Emergency Switch control Open circuit Fault Found. Now we change a VFD Controller and Maintenance the control circuit Now…