There was so much dust
Similar Posts
ACTIVITY | DAILY REPORTS | MOV | Pappu | Parvez
IRP-2 3V07A MOV Reset, reprogramming and configuration work complete.
Posted on
Problem: This MOV is abnormal working. MOV Open time & close time 0% to 100% value not showing. IRP-2 3V07A MOV Reset, reprogramming…
ACTIVITY | DAILY REPORTS | DTW | Pappu
DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.
Posted on
DTW-122 PIT Fuse and Serial communication cable check and maintenance complete.Problem: PIT value not showing in the SCADA.Problem found: 1. PIT 24v DC…
Fiber Optic Cable Closure Outdoor Joint Box
Posted on
Fiber Optic Cable Closure Outdoor Joint Box Indication Description Dimension (length x width x height) 435mm x 190mm x 120mm Shock-resistance >=20N.m Type…
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez
DTW-110 Pump inspection & ready to run up.
Posted on
Problem Found: 1. VFD (-) Hz showing 2. Non-return Valve damaged. 3. Reverse water flow. 4. The pump acts as a generator due…