IRP-2 Server Rack Installation and Optical Fiber Rejoin Done

















IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 203 UVR checked, When plug PTT UVR…
1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup